Faccenda Foods

Faccenda Foods

Project Information

Faccenda Foods


    • Location
    • Telford, Shropshire
    • Value
    • £13,500,000
    • Duration
    • 42 Weeks
    • Completed
    • May 2014
Project Overview

Design and construction of a major extension to the existing food factory, in sections, generally compromising of: two storey link core with feature gallery / stairs and intermediate level links between the extension and existing; single storey warehouse incorporating packaging mezzanine floor, over ceiling access; walkways, sub division, fitting out works, pedestrian links to the existing factory and office; enclosed plant areas, integral two storey despatch drivers office and loading bay with canopy; chiller plant; offices at mezzanine level with integral comfort cooled fully finished sub divided; alteration and adaptations to the existing offices; feature external front walkway colonnade; external tray store and storage building; external works including perimeter service road around the northern site boundary linking the western service yard to the service yard to the east, together with drainage swales, realignment of truck parking and landscaping works; and coordination and integration of concurrent tenant's work.

Download project