Faccenda Foods

Faccenda Foods

Project Information

Faccenda Foods


    • Location
    • Telford, Shropshire
    • Value
    • £13,500,000
    • Duration
    • 42 Weeks
    • Completed
    • May 2014
Project Overview

• 140,000 sqft extension including integral chiller controlled factory with over ceiling access & walkways, first floor office, first floor packaging mezzanine and two storey despatch drivers office. • 12 dock levellers off dispatch area with loading bay canopy. • Two storey link core with feature gallery / stairs and intermediate level links between the extension and existing. • Feature external front walkway colonnade. • Alterations and adaptions to the existing offices. • Perimeter concrete service yard, car park, drainage swales and landscaping.

Download project